Laying Treckbed Complete

By Ty’s Model Railroad - 7/23/2010 11:05:00 PM

Benchwork with various construction materials and fully complete foam roadbed

Last weekend I purchased my five Atlas turnouts, a 60 degree crossing, and some other track pieces from PM Hobbycraft in Calgary. I now have almost all of my track other then the turn table and a few pieces that aren’t part of the main lines. Now that I have my exact measurement and can see exactly how the track is going to sit, I completed the rest of the roadbed for the front staging area as well as the lead to the future turn table.

Benchwork with various construction materials and fully complete foam roadbed


  • Share:

You Might Also Like

1 comments


  1. The students will be able to check their UP Board Result for Class 12 via SMS also. The UP Board 12th Result 2021 would comprise the student's Uttar Pradesh 12th Result 2021 Around 25 lakh students will be able to check their UP Board Result 2021 Class 12 for the UP 12th examination which will be conducted in April and May 2021.

    ReplyDelete